CBAM Supplier Review Package v1

Ready for recipient review

A preparation package for recipient review. This is not a CBAM declaration, a statutory operator emissions report, or verification of emissions.

Partial year — provisional

Readiness means the supplied data passes this preparation profile's checks. Reported data, scope, sources and any verification claim still require human review.

Package snapshot

Project
Hot-rolled steel — Supplier package
Product
Hot-rolled steel coils
Producing operator
Northstar Metals
Installation country
Serbia
Recipient
Example EU Importer
Prepared by
Northstar reporting team
Production year
2026
Data coverage
2026-01-01 to 2026-01-31
Dataset version
7
Generated at (UTC)
2026-10-11T15:48:47.201Z
Profile version
cbam-supplier-review/1.0
Project / report ID
58764d2c-031f-43f2-8305-5ac8a725bff3 / 241dc206-005e-4249-ba62-04f29ab579fa
Template code
CBAM_DATA_PACKAGE

Reported emissions and lot illustration

Specific embedded emissions below are supplied values. The application does not calculate installation emissions or determine the applicable CBAM method.

Reported specific-emissions unit
tCO2e / t goods
Direct emissions
2.5 tCO2e / t goods
Operator-reported actual data · Evidence ID: operator-1
Indirect emissions
0.5 tCO2e / t goods
Operator-reported actual data · Evidence ID: operator-1
Optional lot mass
12 t goods
Indicative direct lot emissions
30 tCO2e
Indicative indirect lot emissions
6 tCO2e

Lot net mass × the corresponding reported specific embedded emissions. Direct and indirect remain separate. No precursor amount is added. A missing quantity is not zero. These separate illustrations are not a certificate requirement or a CBAM liability calculation.

Review notes

Evidence references

References only. No referenced documents or attachments are included, fetched or verified. The recipient must obtain access and confirm the scope, version, period and disclosure permission.

operator-1 · Illustrative operator emissions statement

Reference
OPS-2026-JAN, pages 1-5
Version / date
2026-02-01 revision 1
Covered period
2026-01-01 through 2026-01-31
Owner
Northstar Metals
Disclosure
shareable

Package fields

Active values and preparer statements retained from this dataset version. Blank entries mean not supplied. Conditional draft fields that do not apply to the selected treatment are omitted. Evidence and default-value source records are presented in the sections above.

Recipient and period

Recipient
Example EU Importer
Name the customer or reviewer receiving this preparation package.
Prepared by
Northstar reporting team
Person responsible for the supplied information.
Supplier role
Installation operator
Keep the supplier and producing operator distinct.
Production year
2026
Definitive-period production year, 2026 or later. This is not a fiscal year.
Data coverage starts
2026-01-01
Actual first date covered by these values, within the production year.
Data coverage ends
2026-01-31
Actual last date covered, no later than today. Partial-year values remain provisional.

Producing installation

Producing operator
Northstar Metals
Legal name of the installation operator.
Operator contact
Operator reporting team
Contact responsible for the emissions information.
Installation identifier
Not supplied
Existing installation or registry identifier, if available; registration is not inferred.
Installation country
Serbia
Country where the goods are produced.
Installation name
Northstar works
This profile covers one producing installation.
Installation address
Example industrial road 1 — synthetic address
Physical location of the producing installation.

Goods and process boundary

Product name
Hot-rolled steel coils
One product represented by this review package.
Product description
Not supplied
Product specification and production route, if known.
Reported CN code
72081000
Exactly eight digits. Syntax checking does not confirm legal scope or classification.
CN classification review
Needs review
A user-declared review status, not classification verified by this app.
Process boundary and attribution
Operator process attribution and saleable output; see OPS-2026-JAN.
Describe the process, production route, outputs, attribution and period underlying the reported values. Reference the monitoring plan or operator report.
Precursor treatment
Reported direct value includes relevant precursor contribution.
Explain which relevant precursors are already included, or why none apply. No precursor amount is added by this app.
Optional lot net mass (t goods)
12
Tonnes of the named goods. Used only for indicative, separate mass × reported SEE calculations.

Reported emissions

Reported specific-emissions unit
tCO2e / t goods
Only already reported tCO2e per tonne of goods is supported. No functional-unit conversion is performed.
Reported direct embedded emissions (tCO2e / t goods)
2.5
tCO2e/t goods, including the relevant precursor contribution already attributed by the operator. Zero is valid; blank is unknown.
Direct data basis
Operator-reported actual data
A stated basis, not a validated actual-emissions claim.
Direct source evidence ID
operator-1
ID of a document in the evidence register supporting this reported value.
Indirect emissions treatment
Reported separately
Indirect applicability depends on the goods. Not applicable is distinct from zero or unknown.
Reported indirect embedded emissions (tCO2e / t goods)
0.5
Required when indirect emissions are reported; tCO2e/t goods, including relevant precursors. Never added to direct emissions by this app.
Indirect data basis
Operator-reported actual data
Required when indirect emissions are reported.
Indirect source evidence ID
operator-1
Required when reported; must identify an entry in the evidence register.

Evidence and verification statements

Verification evidence status
No verification declared
The app never verifies emissions or checks accreditation.

Rules and official sources

This application profile covers one product, one installation and one production year. It checks selected field formats and cross-references; it does not confirm CN classification, statutory completeness, verification, accreditation, legal applicability or acceptance by a recipient.

Sources inform this preparation profile; they do not make this package an official form. Confirm the applicable rules and source versions for the relevant period.